We have been in charge of supplying the prefabricated construction solution Sistema P3 for the Haro school, with a total of 950m2. The prefabricated structure composed of P3 panels has been manufactured, delivered and assembled in a very short time due to delivery times and thanks to the easyness of assembly of the P3 construction solution. The assembly of the system has been carried out in 15 days, making the school ready for operation in 3 months from the start of the work.

Builder Architecture Surface
Murias FIARK Arquitectos 950 m2